Key Points

The Hillsborough home sits on 120 concrete piers drilled 20 feet deep into the hillside.
Nearly all of the old house's materials were salvaged and donated to nonprofits instead of going to a landfill.
A great room with massive accordion doors opens the home to the outdoors, and the family has private offices, a home gym, and a soccer field.

Building on a Hillsborough hillside can mean taking apart the house already on the lot, then drilling piers for the foundation. Our custom home in Hillsborough went through both.

You’ll learn:

  • What the foundation took on a Hillsborough hillside
  • How an existing house can come down without going to a landfill
  • How a layout opens a home to the outdoors
  • Which details were built in for the family’s daily life

What Did the Hillsborough Home Take?

Our custom home builds start with either a vacant lot or the careful deconstruction of an existing home. The Hillsborough project was the second kind. The homeowners first considered a remodel, looked at several versions of the design, and then chose to deconstruct the house and start fresh. The new home took 2 years, on a budget of $3,600,000.

How Do You Build a Foundation on a Hillsborough Hillside?

Concrete foundation walls with anchor bolts on a dirt site, with a worker on the far wall.

Our custom home in Hillsborough sits on 120 concrete piers drilled 20 feet deep into the earth. Piers are concrete columns drilled into the ground.

On our hillside jobs, we talk with the geotechnical (soils) engineer and the structural engineer at the beginning. The geotechnical engineer takes boring samples to see how competent the soil is, and the structural engineer bases the plans on those results.

On a hillside, we may come in with shotcrete, or drill temporary piers that hold back the hillside. Some of our hillside excavations can be 20 feet deep, and upslope lots are a little riskier because they need so much excavation. Sometimes we hit underground creeks that run through the hills.

The city wants to know how much excavation we plan to do, and all of that gets figured out in pre-construction.

We wrote more about what goes under a hillside home in our post on hillside foundation materials.

Can You Take Down an Existing Home Without Sending It to a Landfill?

Crane lifting a large palm tree with its root ball on a cleared lot while workers watch.

The Hillsborough lot already had a house on it, and the homeowners chose to deconstruct it piece by piece instead of demolishing it. Deconstruction means taking a building apart in pieces so the materials can be reused or donated. Nearly all of the materials were salvaged and donated to nonprofit organizations rather than sent to a landfill.

California’s green building code, CALGreen, requires new homes and demolition jobs that need a local permit to recycle or salvage at least 65% of their nonhazardous construction and demolition debris.

How Do You Design a Custom Home So It Opens to the Outdoors?

Great room with a wood dining table, clerestory windows, and a wide opening to a garden patio.

The house follows the ancient principles of Vaastu Shastra, with a 3-wing design. The great room runs along the north-south axis, and massive accordion doors open it to the outdoors.

The home uses bluestone from the East Coast, polished inside and heat-treated outside.

What Details Does a Custom Home Include for Daily Family Life?

The home was built for a family with 2 children. It includes:

  • A private office for each parent
  • A home gym
  • A dedicated soccer field

The home also has a whole-house vacuum system.

Ready to Plan a Custom Home in Hillsborough With Vought Construction?

If you have a Hillsborough lot, or a house you are deciding whether to keep, we would be glad to talk it through with you. Visit our custom home building in Hillsborough page, then fill out our contact form or give us a call.

Frequently Asked Questions

How much does it cost to build a high-end custom home in Hillsborough?

Our standard custom homes start at $1,000 per square foot. The Hillsborough home we built had a budget of $3,600,000. The final number depends on the size of the home, the upgrades, and the materials you choose.

How long does it take to build a custom home like the one in Hillsborough?

The Hillsborough home took 2 years. A build itself can take a year to 18 months, and some of our builds have run longer than that.

Does it cost more to remodel my home or to tear it down and build new?

A remodel can cost more per square foot than building new. Remodels often come with unforeseen issues hidden behind walls, floors, or foundations.