Key Points

On a 1950s Mill Valley home, we added a dormer to match the existing one, with the same scalloped cedar siding, so the new floor looks like it was always there.
The house is post-and-beam with exposed beams, so we built faux beams to look like the originals and hid every new sprinkler pipe.
The steel and footings went in from outside and under the existing foundation, so none of the finished rooms downstairs were touched.

Adding a floor or a suite means the new space has to feel like it belongs with the old, outside and inside. Here is how that went on a second-floor addition to a 1950s home in Mill Valley, and what it took to keep the hard parts out of sight.

You’ll learn:

  • How we matched a new floor to the outside of the house
  • What the owners asked for when they added a floor
  • How we built the structure without touching the rooms below
  • How we hid sprinkler pipes in a house with exposed beams
  • How the plaster, cabinetry and bathroom finishes came together

How Do You Add a Floor or Suite to a Home So It Flows?

3D rendering of a house with cedar shingle siding, two dormers, a wood deck with stairs, and a patio.

On our 1950s home addition and remodel in Mill Valley, the new floor flows because its outside copies what was already there. We added a dormer to match the existing one, with the same scalloped cedar siding.

Everything to the right of the old dormer is new, and the new siding covers the primary second-floor addition. When it was done, you couldn’t tell the work was complex.

The finished addition was featured in Marin Magazine.

What Do Homeowners Want When They Add a Floor or Suite?

Upstairs room before the remodel, with carpet, white walls, exposed beams, and a large triangular window.

Before the work, the upstairs looked like this: carpet, white walls, exposed beams, and a large triangular window looking out over the roof and trees. It didn’t match the rest of the house.

The owners came to us looking to expand their home and gain a little extra space. Here is what they wanted from the new floor:

  • A larger primary suite, remodeled
  • More of a view from upstairs

How Do You Build an Addition Without Disturbing the Finished Rooms Below?

The owners did not want us to touch any of the interior finishes downstairs. So the steel and footings for the new floor went in around those finishes:

  • We took the exterior off the house and placed all the steel.
  • We dug huge footings, about 4 feet by 4 feet and 6 to 8 feet deep. Crews worked inside the holes, shoveling the dirt out by hand.
  • We got the concrete in under the existing foundation.

The addition in this Short is full of structural steel and moment frames that we craned in from the street.

How Do You Hide New Sprinkler Pipes in a Home With Exposed Beams?

Fire sprinklers had to go into this house, and the city stopped the work for about 2 months because of them. The house is post-and-beam construction, and all the beams are exposed.

So we built faux beams to look like the original ones, and we hid all the sprinkler pipes.

Bathroom with a freestanding tub under a window, a floating wood vanity with a vessel sink, and an arched tiled shower.

In the finished house, you can’t see a single pipe, and you have no idea the house has sprinklers.

How Do the Finishes in a New Suite Come Together?

The architect did all the design work. Some finishes weren’t on the drawings, so we did a lot of work in pre-construction to help get everything bid out. The plaster was one of them, and it was our suggestion to the owners. Here is more on why it helps when an architect and builder work together early.

Here are some of the finishes on this job:

  • Plaster on the walls and ceilings, finished in the primary bedroom with a wax coating that makes it really smooth
  • A rounded plaster headboard in one of the bedrooms, with PVC pipes in the wall to form the curve
  • Custom cabinetry by our cabinet maker, including a cabinet that holds a piece of quartzite of about 200 pounds, with its corner rounded

The owners added the bathroom in this Short in a second phase of work. It was hard to picture before it was finished, but we knew the owner would love it, and it is now his favorite. It has:

  • Wood paneling on the whole bathroom, installed and then stained by our finish carpenters
  • A fan vent made from the same pieces of wood, so the grain flows right through
  • Handmade black tile
  • A custom-made sink

Ready to Plan a Home Addition With Vought Construction?

If you’re thinking about adding a floor or a suite, we’d be glad to look at your home with you and talk through what it can take. You can see more of our home additions on our site, fill out our contact form, or give us a call.

Frequently Asked Questions

Can you match the exterior of my addition to the exterior of my home?

That is what we did on our Mill Valley addition. The new dormer there was built to match the dormer the house already had, and its siding is the same scalloped cedar as the original. The architect did the design on that project, and we built it. Once it was finished, you couldn't tell how complex the work had been.

Can we live in the house while you build the addition?

We strongly advise against living in the house during an addition. It will be dirty and hard to live in, and at times the electric, gas, or water has to be shut off, so you can't use those facilities. If you do stay, we give you white-glove service. Our employees don't touch your furniture, so you move it yourself, or we can handle it for you by paying someone to do it.

How long does an addition like this take?

We tell clients that additions take 3 to 10 months or more, depending on the size and scope. Our Mill Valley addition, phase 2 included, took about 13 months to build, including about 2 months when the city stopped the work over the fire sprinklers. Before construction started, design and the wait for permits took several more months.